Scenario 2 – Synergy + PV Production
This scenario expands the concept of connecting multiple entities by adding shared energy production.
Why?
- Investment costs for energy production infrastructure are shared.
- Leverages the benefits of Scenario 1, where fluctuations in energy production are better absorbed by a larger consumer base.
Import Scenario 2 Master
Upload a previously exported .xlsx file to instantly restore PV configuration, coordinates, and calculated results.
PV Production Settings
Welcome to Scenario 2
To start, either start Scenario 1 and continue here, or upload a master .xlsx file using the form on the left.